No Nama Peserta K SK SB B A T P PT H P PK Alasan
1 CV. AIL ENGINEERING - 75.049.738.0-816.000
2 CV. BARAKATI KARYA TEKNIK - 72.953.620.1-816.000
3 CV. TATA BUMI MALIGE CONSULTANT - 02.857.285.7-816.000
4 CV. DIAGONAL CONSULTANT - 02.620.410.7-816.000
5 cv. alfa engineering consultant - 02.857.513.2-816.000
6 CV. ALBANNA BUTUNI ENGINEERING - 81.490.540.2-816.000
7 CV. BUTON EXPLORE CONSULTANT - 75.468.280.5-816.000
8 cv.moment teknik - 74.959.365.3-213.000
9 CV. TECH ENGINEERING Consultant - 03.054.188.2-816.000
10 ENGINEER SEPULUH CONSULTANT - 81.852.726.9-811.000
11 CV. MEGA DESIGN ENGINEERING - 03.204.429.9-816.000
12 cv pilar utama consultant - 84.836.333.9-816.000
13 CV. CAHAYA NUSANTARA CONSULTANT - 03.167.198.5-816.000
14 ABZARIH BERJAYA Consultant - 85.873.523.6-816.000
15 CV.ACCESS CONSULTANT - 03.269.414.3-816.000
16 CV. DUTA ASANA CONSULTANT - 02.085.054.1-816.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak