No Nama Peserta K SK SB B A T P PT H P PK Alasan
1 CV. BARAKATI KARYA TEKNIK - 72.953.620.1-816.000 68,0 68,0
2 MAHA RIZQI CONSULTANT - 70.264.073.1-816.000 66,0 66,0
3 CV. AIL ENGINEERING - 75.049.738.0-816.000 56,0 56,0
4 CV. DRAFT CONSULTANT - 84.102.069.6-816.000 72,0 72,0
5 CV. Kamali Inspirasi - 81.454.722.0-816.000
6 CV. MEGA DESIGN ENGINEERING - 03.204.429.9-816.000
7 ALTAFINDO - 02.857.438.2-816.000
8 CV. Cipta Barakati - 81.460.501.0-816.000
9 CV. MUTIARA AIR - 81.114.084.7-816.000
10 CV. CAHAYA NUSANTARA CONSULTANT - 03.167.198.5-816.000
11 CV. ONE MY ENGINEERING CONSULTANT - 81.141.335.0-816.000
12 ABZARIH BERJAYA Consultant - 85.873.523.6-816.000
13 CV. TECH ENGINEERING Consultant - 03.054.188.2-816.000
14 PT. BUTON CIPTA NUSA CONSULTAN - 73.607.570.6-816.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak